Models 24-CGA-10, 24-CGP-10, 24-CEA-10, 24-CEP-10
SteamCraft 10 Service Manual, Chapter 2
Page 27
Furnishing and installing the gas supply lines, valves, regulators, and acces sories is
the responsibility of the owner and/or installer. When installing the gas supply lines
and accessories, observe the following instructions.
1. Install the gas supply lines in accordance with local codes and/or the National
Fuel
Gas Code, ANSI Z223.1-(latest edition).
2. Refer to Figure 2-14 for Cleveland Range recommended layout of the gas supply
lines. Refer to Figure 2-2, Dimensions and Clearances for pressure data and
connection locations.
Testing Water Supply Lines
Treated Water Connection (With SteamerGard)
1. Verify that the SteamerGard water treatment system has been installed according
to the SteamerGard installation manual. The 40-mesh strainer supplied with the
SteamerGard must be installed at the SteamerGard water inlet.
2. Refer to Figure 2-11. Verify that suitable check valves are installed according to
NSF and local codes. The condenser line check valve should be installed
between the tee and the steamer. The steam generator line check valve should be
installed between the SteamerGard and the steamer.
3. Look at the flow indicating arrows on the strainers and check valves. Verify that
flow is toward the steamer.
4. Install the connecting lines and flush them before connecting them to the water
supply fittings on the steamer. Be sure the line from the SteamerGard water
treatment system connects to the steam generator fitting on the SteamCraft 10.
1. Check all connections for proper tightness. Remove the side panel to inspect
water connections inside the steamer (Figure 2-7).
2. Open the water supply valves.
3. Check all lines and connections for leakage, both inside and outside the steamer.
4. If no other inspections are being made at this time, replace the right side access
panel.
Install and Connect Gas
Supply Lines
Untreated Water Connection (Without SteamerGard)
1. Refer to Figure 2-10. Verify that a suitable check valve is installed according to
NSF and local codes.
2. Look at the flow indicating arrows on the strainer and check valve and verify that
flow is toward the steamer.
3. Install the tee and connecting lines - Flush these lines before connecting them to
the water supply fittings on the steamer.