![Cleveland 24-CEA-10 Service Manual Download Page 151](http://html.mh-extra.com/html/cleveland/24-cea-10/24-cea-10_service-manual_2622791151.webp)
Models 24-CGA-10, and 24-CEA-10
SteamCraft 10 Service Manual, Chapter 6
Page 145
continuity, and secure connections. Replace or repair faulty
wiring and connections. On the bottom compartment check the
black and yellow wires to the high temperature limit switch, float
assembly, and the contactor for continuity, and secure
connections. Replace or repair faulty wiring and connections.
b. Test float low limit switch.
c. Test the contactor for an open coil
Refer to Connection Points and Wiring section on page 92, and inspect the
terminal block and its connection leads accordingly.
CT:23 & CT:24 Heater and Dryer Elements - Model 24-CEA-10
1. Set the voltmeter to the 500 VAC scale.
2. Set the ON/OFF switch to the ON position.
3. Set the TIMED/MANUAL switch to the MANUAL position. Operate the
SteamCraft 10 for about 10 minutes, or until it is steaming continuously,
and the water in the float cylinder is at operating level.
4. Refer to Figure 6-41, and check for 230 VAC across all three heater
coils.
• If the meter reads 230 VAC across all three heater coils, continue this
procedure with step 5.
• If the meter does not read 230 VAC across one or more of the heater
coils, the fault
is not in the heater elements.
a. Check the wires to the heater and dryer elements for continuity and
secure connections. Replace or repair faulty wiring and connec-
tions.
b. Check for 230 VAC in each phase at the main power supply
switch.
c. Test the heater contactor.
d. Check the resistance of heater and dryer elements as described in
steps 5 and 6 of this procedure.
5. Prepare the SteamCraft 10 components for testing the heater and dryer
element resistance as described below. Perform the resistance tests as
described in step 6.
a. Set both the ON/OFF switch and the main power switch to the OFF
position.
b. Refer to the schematic wiring diagram and disconnect all heater and
dryer leads from element terminals of contactor.
c. Set both the ON/OFF switch and the main power switch to the ON
position. Allow water to fill the float cylinder to operating level.
d. Zero adjust the ohmmeter at the lowest scale. Continue this procedure
with step 6.
Cleveland Range,
Inc
.
Printed
3/93
Terminal Block