![CITROEN Berlingo 2003 Handbook Download Page 204](http://html1.mh-extra.com/html/citroen-0/berlingo-2003/berlingo-2003_handbook_2611129204.webp)
200
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines : RHY - RHZ N° RPO 9128
#
Uncouple, plug and move aside, using tool
[7]
, the fuel delivery pipe
(2)
and
return pipe
(1)
.
Remove
:
Screws
(3), (4
) and
(6)
.
Screw
(7)
.
The upper timing cover
(5).
WARNING :
Refit screw
(7)
equipped with a spacer (
17 mm
thick), tighten
the screw
(7)
to
1,5 ± 0,1 m. daN.
NOTE :
The screw
(7)
is one of the screws securing the coolant pump and
is there for its sealing.
Put the gear lever in
5th
gear.
Turn the road wheel to turn the engine in its direction of rotation.
Orient the camshaft pulley in the pegging position, use a mirror if necessary.
Peg the camshaft, using tool
[5]
.
Peg the engine flywheel, using tool
[3]
.
B1EP1A7C
B1BP2H3C
B1BP2H2C
B1BP2R2C
XSARA - XSARA PICASSO