DLP-G562 Mounting the Brackets on the ONS 15454 M6 Shelf for ETSI Rack Configuration, on page
34
•
•
•
•
Step 3
Complete the necessary rack mounting task as applicable:
•
DLP-G566 Mount the ONS 15454 M6 Shelf on a Rack (One Person) , on page 45
.
•
DLP-G567 Mount the ONS 15454 M6 Shelf on a Rack (Two People) , on page 47
•
DLP-G568 Mount Multiple ONS 15454 M6 Shelves on a Rack , on page 48
.
Step 4
Connect the chassis to the office ground. For detailed instructions on how to ground the chassis, see the
Electrostatic Discharge and Grounding Guide for Cisco CPT and Cisco ONS Platforms
.
Step 5
Continue with
NTP-G259 Open and Remove the Standard Door of the ONS 15454 M6 Shelf , on page 57
Stop. You have completed this procedure.
DLP-G674 Verify the ONS 15454 M6 Shelf for AC Power Module Installation
This task verifies the shelf for AC power module installation.
Purpose
None
Tools/Equipment
NTP-G305 Unpack and Inspect the ONS 15454, ONS 15454 M2, and ONS 15454
M6 Shelves
Prerequisite Procedures
Required
Required/As Needed
Onsite
Onsite/Remote
None
Security Level
Procedure
Step 1
Verify the position of the mechanical locking system on the rear side of the chassis. To use the AC power
module, the screw must be close to the AC silk-screen text (see the following figure).
Installing the ONS 15454 M6 Shelf
27
Installing the ONS 15454 M6 Shelf
DLP-G674 Verify the ONS 15454 M6 Shelf for AC Power Module Installation