Rev Z
Page 2
11/28/2011
Copyright © 2011 by Cirus Controls, LLC. All Rights Reserved. No part of this material may be reproduced without the express
written permission of Cirus Controls LLC for each reproduction.
Configuration Log Page .................................................................................................. 4
Limited Warranty ........................................................................................................ 5
Revision Level of this Manual ........................................................................................ 6
Package Contents ............................................................................................................ 6
Functional Overview and Fundamental Operating Parameters ...................................... 6
Open Loop or Closed Loop Spreading ....................................................................... 6
Distance or Area Spreading of Granular Mat’l. with Proportional Gate .................... 7
“Prescription Spreading” and/or “Operator Choice” Spreading ................................. 7
Temperature Response Spreading............................................................................... 7
Load and Rate Calculator ............................................................................................ 7
High Current Electric Pre-Wet Systems ..................................................................... 8
Single or Two-Tier Anti-Ice System........................................................................... 8
Data Recording and
Drive by Download™
for Data .................................................. 9
Operating Functions Matrix – SpreadSmart Rx .......................................................... 9
Basic Operation Controls: ......................................................................................... 10
Startup Checklist – SpreadSmart Rx
TM
........................................................................ 10
Installation Steps ........................................................................................................... 10
STEP 1 - Installation ................................................................................................. 10
Guard Against RF Interference ................................................................................. 10
Installing the control unit .......................................................................................... 11
Connecting the cabling ............................................................................................. 11
STEP 2 – Power Verification .................................................................................... 11
Multiple Uses of touch screen buttons (=key pad switches): ................................... 11
STEP 3-Set up Wizard .............................................................................................. 12
STEP 4: “Un-Calibrated” Automatic Mode ............................................................ 12
STEP 5: Speedometer Calibration ........................................................................... 13
STEP 6- Pre-Delivery Functional Test with Diagnostics ......................................... 14
Using stored calibration files to configure multiple trucks ....................................... 14
Post Delivery Steps ....................................................................................................... 15
STEP A - Material Setup & Calibration ................................................................... 15
Material Setup ........................................................................................................... 15
Granular Drop Test - Open or Closed Loop ................................................................. 15
STEP B - Spinner Calibration with Granular Material ............................................. 17
STEP C - Post Delivery Functional Test .................................................................. 18
Managing Materials – Granular, Pre-Wet and Anti-Ice ................................................ 18
Choosing a material name and recording data: ......................................................... 19
Changing “Materials” program during normal operation ......................................... 19
Temp Response
TM
Prescription Set Up – for each material type.............................. 19
Recording Spreading Data for each named material ................................................ 21
Managing Information on SpreadSmart Rx
TM
............................................................. 21
Battery Backup for Date and Time ........................................................................... 22
Accessing Storm and Season Totals (SST) from
SpreadSmart Rx
TM
...................... 22
Downloading Storm and Season Totals (SST) from
SpreadSmart Rx
TM
................. 23
Re-Setting Totals (SST) on
SpreadSmart Rx
TM
....................................................... 23
Other Downloads – Calibration/System Settings Data ............................................. 24
Operational Modes - Description .................................................................................. 25