1) Click Settings (gear icon) on the right side of the tab. The Settings window will appear.
2) Select “Show Tasks sidebar “ in the Layout section.
3) OR choose View > Show/Hide Tasks.
To sort the tasks in the Tasks sidebar:
1) Click Task Settings (info icon) at the top of the Tasks sidebar. The Task Settings window will open.
2) Choose a sort option.
To specify what tasks appear in the Tasks sidebar:
1) Click Task Settings (info icon) at the top of the Tasks sidebar. The Task Settings window will open.
2) There are two options for filtering tasks that you can change:
•
Hide tasks with due dates outside the calendar view.
Example: if a task has a due date of May 25,
2014 and you’re looking at January 2014 in the Month view the task will be hidden.
•
Hide completed tasks after “x” days.
Example: if you have “x” set to “5” then any task that has been
marked completed or cancelled for more than five days will be hidden. You can specify the value for “x”
in the preferences as shown in the next step.
3) Choose iTriumph > Preferences > Calendars > Advanced.
4) Enable/disable the following option:
•
Hide tasks “x” days after they have been completed or cancelled.
Example, if you have “x” set to “5”
then any task that has been marked completed or cancelled for more than five days will be hidden.
Day View
The Day view displays all the events and tasks scheduled for a single day. In addition, the Day view includes a
Daily Notes region to enter an unlimited amount of notes for each day. The schedule region displays your
events and task for the selected day. The events are sorted by the event’s start time.
When the Day view is showing the current date, a horizontal line will indicate the current time in the schedule
region.
To navigate to a specific day:
In the header region at the top of the Day view are four buttons that allow you to go to a specific date in the
Day view.
1) Click the left arrow to move backward one day at a time.
2) Click the right arrow to move forward one day at a time.
3) Click Today to move to the current day.
4) Choose Calendar > Go To Date to move to a specific date.
To display events in a di
ff
erent format in the schedule region:
The schedule region in the Day view can list events in either an hourly schedule or event list type format. The
hourly schedule format displays the events with the hours of the days on the left hand side. In this format you
can create events by clicking and dragging from the start time to the end time of the event. As the name sug-
gest the list type format displays the events in a list format.
40