page 4
www.centsys.com
7.9. Mounting the Rack
7.9.1. Fitting Different Types of Rack to the Gate
7.9.2. Finalising the Height Adjustment
7.10. Re-assembling the D5 SMART
7.10.1. Override Sensor
7.10.2. Routing the Override Sensor Harness
7.10.3. Placing the Lower Battery Tray and Charger back into Position
7.10.4. Placing the Control Card back into Position
7.10.5. Reconnecting the Harnesses to the Control Card and Charger
8.
COMPLETING THE INSTALLATION
8.1. Fitting the Batteries
8.2. Accessory Installation and Storage
8.3. Wiring the Control Card on its Default Settings
8.3.1. Closing Infrared Beam Wiring (i5 Infrared Beams)
8.3.2. Closing Infrared Beam Wiring (Photon Infrared Beams)
8.3.3. External Radio Receiver and Loop Detector Wiring
8.3.4. Earth Spike Installation
8.3.5. G-ULTRA to D5 SMART Wiring
8.4. Commissioning the System
8.5. Apply Warning Decal
9.
GENERAL MAINTENANCE
9.1. Gate Maintenance
9.2. D5 SMART Maintenance
10.
INSTALLATION HANDOVER
11.
WARRANTY INFORMATION
Page 36
Page 37
Page 40
Page 42
Page 42
Page 42
Page 43
Page 44
Page 45
Page 46
Page 46
Page 47
Page 48
Page 48
Page 49
Page 50
Page 51
Page 52
Page 52
Page 53
Page 54
Page 54
Page 55
Page 56
Page 57
CONTENTS
Icons used in this manual
This icon indicates tips and other information that could be useful during the
installation.
This icon denotes variations and other aspects that should be considered during
installation.
This icon indicates warning, caution or attention! Please take special
note of critical aspects that MUST be adhered to in order to prevent
injury.