page 3
www.centsys.com
1. INTRODUCTION
1.1. Important Safety Information
1.2. Lightning Protection
1.3. Theft Protection
2. SPECIFICATIONS
2.1. Physical Dimensions
2.2. Technical Specifications
3.
PRODUCT IDENTIFICATION
4.
REQUIRED TOOLS AND EQUIPMENT
5.
NEW SITE INSTALLATION PREPARATION
5.1. General Considerations for the Installation
5.2. Endstops
5.3. Guide-rollers and Anti-lift Brackets
5.4. Starting and Running Forces
5.5. Cabling Requirements
6. LUBRICATION
7.
OPERATOR INSTALLATION
7.1. New Site Installations
7.1.1. Locating an Initial Reference Point
7.1.2. Minimum Clearances
7.1.3. Locate the Operator's Position
7.1.4. Foundation Plate Installation
7.2. Retro-fit Installations (Existing Sites)
7.3. Conduit and Cable Length
7.4. Preparing the D5 SMART for Installation
7.4.1. Removing the Charger
7.4.2. Removing the Lower Battery Tray
7.4.3. Removing the Control Card
7.5. Mounting the Gearbox
7.6. Routing the Cables
7.7. Manual Override
7.8. Height Adjustment
Page 5
Page 6
Page 8
Page 8
Page 9
Page 9
Page 9
Page 11
Page 12
Page 13
Page 13
Page 14
Page 14
Page 15
Page 16
Page 17
Page 18
Page 18
Page 18
Page 19
Page 20
Page 24
Page 26
Page 26
Page 27
Page 27
Page 28
Page 29
Page 30
Page 32
Page 34
Page 35
Contents