page 24
www.centsys.com
7.1.4. Foundation Plate Installation
7.1.4.1. New Concrete Foundation
OPERATOR INSTALLATION
SECTION 7
The foundation plate can either be set into a new concrete foundation, as in
Section 7.1.4.1, or bolted down onto an existing concrete plinth as in Section
7.1.4.2.
FIGURE 18. FOUNDATION PLATE ASSEMBLY - TOP VIEW
FIGURE 19
FIGURE 20
Again, using a pair of pliers, gently
bend the two legs on each tab to an
angle of 90° in opposite directions as
shown in Figure 20.
Be careful not to deform
the Foundation Plate
while bending the tabs.
Bottom face of the
Foundation Plate
Foundation Plate
Tab
Tab
Legs
View once tabs
have been bent
down correctly
View once legs
have been bent
correctly
Mounting Bolt
Tab Legs
Tab
Cutouts for Conduit
(New and Existing Installations)
Towards Gate
Mounting Bolt
Tab
Bolt-down point for
existing Concrete Plinth
Bolt-down point for
existing Concrete Plinth
Bolt-down point for
existing Concrete Plinth
Mounting Bolt
Tab Legs
Using a pair of pliers, gently bend
the two tabs of the foundation plate
down to a 90° angle as shown in
Figure 19.
Be careful not to deform
the Foundation Plate
while bending the tabs.
Check that the M10 half-
nuts are tightened to 20Nm
on the mounting bolts.