59
Name of the levels and timers
1-
Choice Bagging Equipment (CBE )
2-
Bag Pre-Inflate
3-
Vibrator / Densifier On-Delay
4
. Slide gate / Feed gate filler head
5-
Input / Output Screen illuminations
Adjusting the Timer:
Use the
A
or
B
button to Scroll forward or backward through the Timers.
When you reach the desired timer press the OK key. (The timer is able to be edited when
the selected time flashes with solid blocks. The timer is not editable when the selected
timer flashes the time only.)
Use the
+
and
–
keys to adjust the timer up and down in 0.1 second increments.
When done press the OK key again and timers will flash not as a block but more individual.
Press the Escape key to return to menu and using the up/ down arrows scroll back to the
CBE screen.
Summary of Contents for 520
Page 1: ...1 CBE 520 BULK BAGGER Safety Installation Operation Maintenance ...
Page 10: ...10 CHAPTER 1 General Information ...
Page 14: ...14 CHAPTER 2 INSTALLATION GUIDE ...
Page 18: ...18 CHAPTER 3 LOAD CELL WIRING ...
Page 22: ...22 Figure 3 500 Series Bottom View ...
Page 23: ...23 CHAPTER 4 COMPONENT DESCRIPTION ...
Page 26: ...26 CBE DENSIFYING DECK ...
Page 27: ...27 CHAPTER 5 OPERATIONAL SEQUENCE ...
Page 33: ...33 CHAPTER 6 Conveyors Setup ...
Page 38: ...38 CHAPTER 7 PLC and Timers and Adjustments ...
Page 43: ...43 CHAPTER 8 WEIGH CONTROLLER And ADJUSTMENTS ...
Page 45: ...45 ...
Page 48: ...48 See attached Documentation For the Controller specifically Used on your machine ...
Page 49: ...49 Chapter 9 MAINTENANCE ...
Page 51: ...51 CHAPTER 10 TROUBLESHOOTING ...
Page 55: ...55 ...
Page 57: ...57 CHAPTER 12 PLC and TIMER ADJUSTMENTS ...
Page 61: ...61 DRAWINGS AND SCHEMATICS See attached Schematics And Drawings specific for your machine ...