
41
NOTE: IF THE DRBBLE FILL TIME IS TOO SHORT, YOU WILL EXPERIENCE ERRATIC
WEIGHTS BECAUSE THE SETTLER /SCALE WILL NOT HAVE ENOUGH TIME TO
STABILIZE.
Vibrating Deck Timer
This is the length of time the vibratory table vibrates the BB.
Bag Latch Open Timer
When this timer is activated the bag latches open for the time the timer is set for and close
again.
Input / Output Screen
The PLC screen displays which inputs and outputs are signaling on and off at any point
during the bag filling process. They are “on” when they are gray color or lite.
B. TIMER FUNCTION EXPLANATONS FOR 405:
Pre-Inflate Bulk Bag Timer
This timer is used to control the duration that the bag inflation blower runs to inflate the bag
at the beginning of each bag fill. It is adjusted in 0.1 second increments. Factory setting is
20 seconds.
Vibratory / Densifier On Delay
This is an on-delay timer used to allow material to get into the bag, before turning on the
bag densification system. It is adjusted in 0.1 second increments. Factory setting is 20
seconds. The Avery controller has a Deck vibrating timer in the PLC
NOTE: IF THE DRBBLE FILL TIME IS TOO SHORT, YOU WILL EXPERIENCE ERRATIC
WEIGHTS BECAUSE THE SETTLER /SCALE WILL NOT HAVE ENOUGH TIME TO
STABILIZE.
Vibrating Deck Timer
This is the length of time the vibratory table vibrates the BB.
Summary of Contents for 520
Page 1: ...1 CBE 520 BULK BAGGER Safety Installation Operation Maintenance ...
Page 10: ...10 CHAPTER 1 General Information ...
Page 14: ...14 CHAPTER 2 INSTALLATION GUIDE ...
Page 18: ...18 CHAPTER 3 LOAD CELL WIRING ...
Page 22: ...22 Figure 3 500 Series Bottom View ...
Page 23: ...23 CHAPTER 4 COMPONENT DESCRIPTION ...
Page 26: ...26 CBE DENSIFYING DECK ...
Page 27: ...27 CHAPTER 5 OPERATIONAL SEQUENCE ...
Page 33: ...33 CHAPTER 6 Conveyors Setup ...
Page 38: ...38 CHAPTER 7 PLC and Timers and Adjustments ...
Page 43: ...43 CHAPTER 8 WEIGH CONTROLLER And ADJUSTMENTS ...
Page 45: ...45 ...
Page 48: ...48 See attached Documentation For the Controller specifically Used on your machine ...
Page 49: ...49 Chapter 9 MAINTENANCE ...
Page 51: ...51 CHAPTER 10 TROUBLESHOOTING ...
Page 55: ...55 ...
Page 57: ...57 CHAPTER 12 PLC and TIMER ADJUSTMENTS ...
Page 61: ...61 DRAWINGS AND SCHEMATICS See attached Schematics And Drawings specific for your machine ...