
34
Conveyor Setup and Adjustment:
For initial conveyor setup refer back to the layout drawing for approximate dimensions. Once the
BBL is in the final Position then take a chalk line and make a line parallel with the BB filler structure
and align the conveyors off that line. Then maintain the following:
For the initial setup make sure the powered discharge conveyors are at equal heights
(in feed and out feed). Also, they must of equal height to the receiving end of the
gravity roller conveyor.
Maintain a minimum clearance of a 1/2" between the bulk bag filler discharge conveyor
and the 2nd conveyor to be sure you don't influence your scale weighing.
A. Maintenance:
Check Live Chain Roller (LRC) once a year and remove slack in the chains as required.
Check oil levels on gear boxes once a year.
B. Installation and Maintenance of Speed Reducers and Drives
This manual provides information concerning usage, lubrication, and maintenance of the
Speed Reducers. To maximize the life and efficiency of your reducers follow these
instructions on a regular basis.
***************
To determine the ratio and/or the assembly date of the reducer refer to the numbers
stamped on the end of the output shaft.
If properly used, the reducer should require little maintenance except for scheduled
lubrication.
Initial Oil Change: Drain the oil in a new Speed Reducer after approximately 500 hours of
operation and refill with recommended oil from lubrication chart.
Summary of Contents for 520
Page 1: ...1 CBE 520 BULK BAGGER Safety Installation Operation Maintenance ...
Page 10: ...10 CHAPTER 1 General Information ...
Page 14: ...14 CHAPTER 2 INSTALLATION GUIDE ...
Page 18: ...18 CHAPTER 3 LOAD CELL WIRING ...
Page 22: ...22 Figure 3 500 Series Bottom View ...
Page 23: ...23 CHAPTER 4 COMPONENT DESCRIPTION ...
Page 26: ...26 CBE DENSIFYING DECK ...
Page 27: ...27 CHAPTER 5 OPERATIONAL SEQUENCE ...
Page 33: ...33 CHAPTER 6 Conveyors Setup ...
Page 38: ...38 CHAPTER 7 PLC and Timers and Adjustments ...
Page 43: ...43 CHAPTER 8 WEIGH CONTROLLER And ADJUSTMENTS ...
Page 45: ...45 ...
Page 48: ...48 See attached Documentation For the Controller specifically Used on your machine ...
Page 49: ...49 Chapter 9 MAINTENANCE ...
Page 51: ...51 CHAPTER 10 TROUBLESHOOTING ...
Page 55: ...55 ...
Page 57: ...57 CHAPTER 12 PLC and TIMER ADJUSTMENTS ...
Page 61: ...61 DRAWINGS AND SCHEMATICS See attached Schematics And Drawings specific for your machine ...