
39
PLC (This device is not a weight controller)
PLC means Programmable Logical Controller. Our PLC is programmed with specific programs
which controls inputs and outputs to work with our equipment. Our programs are set up for Valve
filling, O/M net weigh and Bulk Bag weighing equipment.
In the PLC program, there are timers going to specific functions on the various types of equipment
which we factory. We set them at the factory but need to be fined tuned in the field. Below we
discuss how to adjust the timers when you doing the fine tuning to functions in the field.
PLC Screen
Summary of Contents for 520
Page 1: ...1 CBE 520 BULK BAGGER Safety Installation Operation Maintenance ...
Page 10: ...10 CHAPTER 1 General Information ...
Page 14: ...14 CHAPTER 2 INSTALLATION GUIDE ...
Page 18: ...18 CHAPTER 3 LOAD CELL WIRING ...
Page 22: ...22 Figure 3 500 Series Bottom View ...
Page 23: ...23 CHAPTER 4 COMPONENT DESCRIPTION ...
Page 26: ...26 CBE DENSIFYING DECK ...
Page 27: ...27 CHAPTER 5 OPERATIONAL SEQUENCE ...
Page 33: ...33 CHAPTER 6 Conveyors Setup ...
Page 38: ...38 CHAPTER 7 PLC and Timers and Adjustments ...
Page 43: ...43 CHAPTER 8 WEIGH CONTROLLER And ADJUSTMENTS ...
Page 45: ...45 ...
Page 48: ...48 See attached Documentation For the Controller specifically Used on your machine ...
Page 49: ...49 Chapter 9 MAINTENANCE ...
Page 51: ...51 CHAPTER 10 TROUBLESHOOTING ...
Page 55: ...55 ...
Page 57: ...57 CHAPTER 12 PLC and TIMER ADJUSTMENTS ...
Page 61: ...61 DRAWINGS AND SCHEMATICS See attached Schematics And Drawings specific for your machine ...