Table 1: Connector Wiring
WIRING DESIGNATION
WIRE COLOR
(+) Excitation Red
Red
(-) Excitation
Black
(+) Signal
Green
(-) Signal
White
(+) Sense
Blue
(-) Sense
Brown
Ground or Shield
Clear
CALIBRATION INSTRUCTIONS
1. Calibrate the scale to controller indicator per instructions supplied (See Chapter 4 for Calibration
Instructions).
2. After calibration has been completed, take a known weight (ideally 25% of 10,000 # capacity)
and check each corner. Place weight between center of scale and each corner one at a time as
shown in
Figure 1: Load Cell Configurations.
Use the same calibrated weight in each corner.
3. If the indicator weight reading deviates from the known weight, use the junction box trim pot for
that corner and adjust as needed. A qualified service technician is highly recommended to
perform this procedure. Call CBE to schedule a service technician to assist you with installation
of your system.
4. To adjust the corner weight readings, use the trim pot designated for that corner which is
numbered the same as the corner you need to adjust. Turning the pot clockwise increases the
weight reading. Refer to
Figure 2: Junction Box connections
for the correct location.
5. After each corner has been checked and calibrated, make a final check of your calibration in all
corners and center of the scale.
6. The scale is now calibrated and ready for use.
LOAD CELL REPLACEMENT
Should a load cell become damaged due to an overload condition, replacement load cells can be
ordered from CBE. The part number for the load cell can be found on the Recommended Spare
Parts List in this manual.
1. Unbolt the defective load cell, and then remove leveling load foot from the load cell.
2. Disconnect load cell cable from junction box and attach a chase wire to the load cell cable.
Summary of Contents for 520
Page 1: ...1 CBE 520 BULK BAGGER Safety Installation Operation Maintenance ...
Page 10: ...10 CHAPTER 1 General Information ...
Page 14: ...14 CHAPTER 2 INSTALLATION GUIDE ...
Page 18: ...18 CHAPTER 3 LOAD CELL WIRING ...
Page 22: ...22 Figure 3 500 Series Bottom View ...
Page 23: ...23 CHAPTER 4 COMPONENT DESCRIPTION ...
Page 26: ...26 CBE DENSIFYING DECK ...
Page 27: ...27 CHAPTER 5 OPERATIONAL SEQUENCE ...
Page 33: ...33 CHAPTER 6 Conveyors Setup ...
Page 38: ...38 CHAPTER 7 PLC and Timers and Adjustments ...
Page 43: ...43 CHAPTER 8 WEIGH CONTROLLER And ADJUSTMENTS ...
Page 45: ...45 ...
Page 48: ...48 See attached Documentation For the Controller specifically Used on your machine ...
Page 49: ...49 Chapter 9 MAINTENANCE ...
Page 51: ...51 CHAPTER 10 TROUBLESHOOTING ...
Page 55: ...55 ...
Page 57: ...57 CHAPTER 12 PLC and TIMER ADJUSTMENTS ...
Page 61: ...61 DRAWINGS AND SCHEMATICS See attached Schematics And Drawings specific for your machine ...