12
9. Keep fingers, hands, feet, clothing, etc., out of the path of pneumatically operated
components.
10 Safety glasses should be worn in equipment area.
11. Follow the safety regulations for your plant. ALWAYS USE GOOD JUDGEMENT.
SPECIFIC REQUIREMENTS
1. Voltage
The system is designed for one location hookup. If the unit is equipped with a vibratory table
or power conveyors, 3 phase voltage will be required. The control voltage will be
maintained through a step-down transformer in the control panel. If the unit is only equipped
with the digital controller and solenoid operated controls, only 110 Volt single phase power
is required.
2. Air Requirements
The system is designed for one location hookup. The maximum air requirements when the
machine includes all available functions is approximately 3.9 CFM @ 80 PSI per fill cycle.
3. Solenoids / Pneumatics
.
All pneumatic components (air valves & cylinders) are self-lubricating and additional lubricated air
is not required. If lubricated air is used then lubricated air must be used for the life of all the
cylinders.
Connect high-pressure airline to filter regulator, located on back
side of packer. A suitable source of supply is a
(1/2” pipe
connection).
It is recommended that an extra water trap (not supplied with
machine) be installed prior to the regulator in the high-pressure
airline and the packer. Drain trap as required.
Connect air hoses to cylinder of bag chair for automatic bag
discharge (optional equipment). If the machine was ordered
from the factory with options, this will already be done. If the
machine was not originally ordered with an option, the manifold
should be pre-plumbed for one option at a later time.
Connect all air hoses which were disconnected for shipment.
All hoses and related fittings are correspondingly color coded
for
ease of re-assembly.
Summary of Contents for 520
Page 1: ...1 CBE 520 BULK BAGGER Safety Installation Operation Maintenance ...
Page 10: ...10 CHAPTER 1 General Information ...
Page 14: ...14 CHAPTER 2 INSTALLATION GUIDE ...
Page 18: ...18 CHAPTER 3 LOAD CELL WIRING ...
Page 22: ...22 Figure 3 500 Series Bottom View ...
Page 23: ...23 CHAPTER 4 COMPONENT DESCRIPTION ...
Page 26: ...26 CBE DENSIFYING DECK ...
Page 27: ...27 CHAPTER 5 OPERATIONAL SEQUENCE ...
Page 33: ...33 CHAPTER 6 Conveyors Setup ...
Page 38: ...38 CHAPTER 7 PLC and Timers and Adjustments ...
Page 43: ...43 CHAPTER 8 WEIGH CONTROLLER And ADJUSTMENTS ...
Page 45: ...45 ...
Page 48: ...48 See attached Documentation For the Controller specifically Used on your machine ...
Page 49: ...49 Chapter 9 MAINTENANCE ...
Page 51: ...51 CHAPTER 10 TROUBLESHOOTING ...
Page 55: ...55 ...
Page 57: ...57 CHAPTER 12 PLC and TIMER ADJUSTMENTS ...
Page 61: ...61 DRAWINGS AND SCHEMATICS See attached Schematics And Drawings specific for your machine ...