
21
WARNING: DO NOT CUT THE LOAD CELL CABLE!
3. Pull the load cell cable out of the conduits built into the frame channels. The chase
wire will be used to pull the new load cell cable through the formed channel.
4
.
Install the new load cell by reversing the preceding steps.
5. To verify correct load cell/junction box terminal matching, see the numbers on the terminals
inside the junction box and the corner numbering diagram in
Figure 1: Load Cell
Configuration
and
Figure 2 Junction Box Connections.
6. Position load cells with load cell alignment arrow pointing up toward the deck. With the torque
wrench, tighten all mounting bolts to 75 ft./lbs.
7. Route the load cell cables in each corner so that the cable is free from possible contact with the
load cell or load foot. Pull cable towards junction box, (not to tight) and coil up extra length with
cable ties and securely store inside channel per figure 3
(Below).
8. Pass end of load cell cable through cable fittings in the NEMA 4X junction box.
Re-calibrate scale after a load cell replacement. Follow the calibration instructions in Chapter 8
- Weight Controller section of this manual.
Summary of Contents for 520
Page 1: ...1 CBE 520 BULK BAGGER Safety Installation Operation Maintenance ...
Page 10: ...10 CHAPTER 1 General Information ...
Page 14: ...14 CHAPTER 2 INSTALLATION GUIDE ...
Page 18: ...18 CHAPTER 3 LOAD CELL WIRING ...
Page 22: ...22 Figure 3 500 Series Bottom View ...
Page 23: ...23 CHAPTER 4 COMPONENT DESCRIPTION ...
Page 26: ...26 CBE DENSIFYING DECK ...
Page 27: ...27 CHAPTER 5 OPERATIONAL SEQUENCE ...
Page 33: ...33 CHAPTER 6 Conveyors Setup ...
Page 38: ...38 CHAPTER 7 PLC and Timers and Adjustments ...
Page 43: ...43 CHAPTER 8 WEIGH CONTROLLER And ADJUSTMENTS ...
Page 45: ...45 ...
Page 48: ...48 See attached Documentation For the Controller specifically Used on your machine ...
Page 49: ...49 Chapter 9 MAINTENANCE ...
Page 51: ...51 CHAPTER 10 TROUBLESHOOTING ...
Page 55: ...55 ...
Page 57: ...57 CHAPTER 12 PLC and TIMER ADJUSTMENTS ...
Page 61: ...61 DRAWINGS AND SCHEMATICS See attached Schematics And Drawings specific for your machine ...