46
ADJUSTING PREACT
To adjust the PreAct, use the same procedure as you would to get to target weight. Just
advance to the next step
by pressing the “0” / zero key. Next up is “Preact“. Preact is the
value amount you enter when you put the filled bag on the floor scale. Exam: The Bag
weighs 52# and target weight is 50. You would enter minus 2# in Preact.
Setting the Motion Delay
◙ Press 100 <
SELECT
> 23640 <
TIMERS & ADJUST
> <
ENTER
>
◙ Press 114 <
SELECT
> to display P114. This is defaulted at 0.5 s or 1.0 s. To turn
this setting off, press 0<
ENTER
>. NOTE: This WILL turn off ANY motion delays in
the program. At the end of some of the CBE programs, there are motion delays to
get the most accurate reading. Turning off the window MAY affect final readings.
◙ After making a change to P114, press <
SELECT
> to be sure that the setting is
saved.
◙ To
exit
out
of
setup
and
save
the
changes,
press
<
ZERO
>
<
CLR
><
ENTER
><
ENTER
>.
Troubleshooting
◙ If nothing is working/running as expected, press <
SELECT
> until Mname Test is
displayed, and press <
ENTER
>. This is a test procedure that should fire any
required set points for the bagging system's operation.
◙ If the start process has begun, but none of the relays are firing, (if installed, press the
STOP key until ABORT is displayed on the indicator) check variable 20, and make
sure it is blank.
◙ To do this, press 80.20<
SELECT
>. Check the value of the variable, if there is
anything stored; press <
CLR
> to clear it out.
◙ If this is blank, cycling power on the indicator will reset any variables that contain
setting for the indicator to run the process.
Troubleshooting
◙ For Code 02 Underload, Code 03 Overload or Code 08 Check Conn., check load cell
connection FIRST!
Summary of Contents for 520
Page 1: ...1 CBE 520 BULK BAGGER Safety Installation Operation Maintenance ...
Page 10: ...10 CHAPTER 1 General Information ...
Page 14: ...14 CHAPTER 2 INSTALLATION GUIDE ...
Page 18: ...18 CHAPTER 3 LOAD CELL WIRING ...
Page 22: ...22 Figure 3 500 Series Bottom View ...
Page 23: ...23 CHAPTER 4 COMPONENT DESCRIPTION ...
Page 26: ...26 CBE DENSIFYING DECK ...
Page 27: ...27 CHAPTER 5 OPERATIONAL SEQUENCE ...
Page 33: ...33 CHAPTER 6 Conveyors Setup ...
Page 38: ...38 CHAPTER 7 PLC and Timers and Adjustments ...
Page 43: ...43 CHAPTER 8 WEIGH CONTROLLER And ADJUSTMENTS ...
Page 45: ...45 ...
Page 48: ...48 See attached Documentation For the Controller specifically Used on your machine ...
Page 49: ...49 Chapter 9 MAINTENANCE ...
Page 51: ...51 CHAPTER 10 TROUBLESHOOTING ...
Page 55: ...55 ...
Page 57: ...57 CHAPTER 12 PLC and TIMER ADJUSTMENTS ...
Page 61: ...61 DRAWINGS AND SCHEMATICS See attached Schematics And Drawings specific for your machine ...