
Plunger Information
B-6
C
ASE
3. M
OVE TOO
S
MALL TO
R
EACH
C
UTOFF
V
ELOCITY
Case 3 is used when Vn < c
Diagram of Move:
v
V
Speed [Hz]
c
time in s
t
Vn
Calculation:
v = 50 Hz
L = 14
V = 5800 Hz
A = 5 full steps
c = 900 Hz
Theoretical Top Velocity
Vn
AL
v
=
+
=
∗ ∗ ∗
+
=
4
4 5 14 2500 50
838
2
2
Hz
if
Vn
c
<
then
Total Move Time
t
Vn
v
L
=
− =
−
∗
=
838 50
14 2500
023
.
seconds
Ramp Up Steps
A
A
1
5
= =
full steps
Summary of Contents for XP 3000
Page 21: ...Hardware Setup 2 5 RS 232 CABLING Figure 2 3 RS 232 Multi Pump Cabling nc ...
Page 22: ...Hardware Setup 2 6 RS 485 CABLING Figure 2 4 RS 485 Multi Pump Cabling RS 485 A RS 485 B ...
Page 23: ...Hardware Setup 2 7 CAN CABLING Figure 2 5 CAN Multi Pump Cabling ...
Page 36: ...Hardware Setup 2 20 Figure 2 12 XP 3000 Threaded Mount Holes ...
Page 134: ......