
Plunger Information
B-3
Move Calculations
C
ASE
1. S
TART
, T
OP
,
AND
C
UTOFF
V
ELOCITIES ARE
E
QUAL OR
T
OP
V
ELOCITY IS SMALLER
THAN
50 H
Z
Case 1 is used when
v
=
V
=
c
or
v
= <50
Diagram of move:
Calculation:
v = 900 Hz L = 14
V = 900 Hz A = 3000 full steps
c = 900 Hz
Total Move Time
t
A
V
= ∗ = ∗
=
2
2 3000
900
6 67
.
seconds
C
ASE
2. R
AMP
U
P
, C
ONSTANT
S
PEED
, R
AMP
D
OWN
Case 2 is used when
A
A
A
1
3
2
+
<
Diagram of Move:
Speed [Hz]
V=c=v
t time in s
Summary of Contents for XP 3000
Page 21: ...Hardware Setup 2 5 RS 232 CABLING Figure 2 3 RS 232 Multi Pump Cabling nc ...
Page 22: ...Hardware Setup 2 6 RS 485 CABLING Figure 2 4 RS 485 Multi Pump Cabling RS 485 A RS 485 B ...
Page 23: ...Hardware Setup 2 7 CAN CABLING Figure 2 5 CAN Multi Pump Cabling ...
Page 36: ...Hardware Setup 2 20 Figure 2 12 XP 3000 Threaded Mount Holes ...
Page 134: ......