SECTION 31 - IMPLEMENT DRIVELINE - CHAPTER 1
31-15
7. Align the hole in the cone, 2, with the grease fit-
ting, 3, in the ring. Align the holes in the cone, ring
and cover band. Install the Philips head screws,
1.
1
20013774
1
3
2
38
Installation
1. Apply anti-seize to the gearbox input shaft. Install
the shear bolt hub on the gearbox shaft.
2. Place the special bolt, 1, thread end first, into the
non machined
end of the yoke hole. Position the
bolt in the yoke with the special tapered portion
of the bolt toward the groove in the shaft. Tap the
bolt end until the head of the bolt is within 1/4
″
of
the yoke and the threaded end is protruding out
of the yoke. Place a washer and nut, 2, on the
bolt. Torque the nut to 142 N
⋅
m (105 ft lbs).
Rap the head of the bolt with a hammer and
retighten the nut.
3. Close the shield, 3.
2
1
50013488
3
39
4. Slide on the front PTO section.
The PTO sec-
tions will only slide together in one radial
position.
The male half has three points. One of
the three points, 1, is flat on top.
1
20013747
40
Summary of Contents for RBX443
Page 1: ...5 5RXQG DOHU 5HSDLU 0DQXDO...
Page 12: ......
Page 42: ...SECTION 00 GENERAL INFORMATION CHAPTER 1 00 30...
Page 60: ...SECTION 31 IMPLEMENT DRIVELINE CHAPTER 1 31 18...
Page 82: ...SECTION 31 IMPLEMENT DRIVELINE CHAPTER 2 31 22...
Page 90: ...SECTION 35 HYDRAULIC SYSTEM CHAPTER 1 35 8...
Page 100: ...SECTION 55 ELECTRICAL SYSTEMS CHAPTER 1 55 10...
Page 113: ...SECTION 55 ELECTRICAL SYSTEMS CHAPTER 3 55 9 BALER LIGHTS WIRING DIAGRAM 17...
Page 114: ...SECTION 55 ELECTRICAL SYSTEMS CHAPTER 3 55 10...
Page 124: ...SECTION 62 PRESSING CHAPTER 1 62 2 SECTIONAL VIEWS FLOOR ROLL 1...
Page 128: ...SECTION 62 PRESSING CHAPTER 1 62 6...
Page 130: ...SECTION 62 PRESSING CHAPTER 2 62 2 SECTIONAL VIEWS STARTER ROLL 1...
Page 134: ...SECTION 62 PRESSING CHAPTER 2 62 6...
Page 150: ...SECTION 62 PRESSING CHAPTER 3 62 16...
Page 164: ...SECTION 62 PRESSING CHAPTER 4 62 14...
Page 178: ...SECTION 62 PRESSING CHAPTER 5 62 14...
Page 196: ......