SECTION 62 - PRESSING - CHAPTER 5
62-11
NOTE:
The instructions for removing and installing
follower roll, 1, are in the first part of this section.
2
1
19993448
24
Installation
1. Assemble the bearings and shields on the strip-
per roll. Install the roll in sledge frame, 1. Use a
longer M10 bolt and drift punch, 2, to assist in
pulling shield, 3, and bearing flange, 4, against
main frame, 1. Tighten these two bolts to 52 N
⋅
m
(38 ft. lbs.). Remove the longer bolt and leave it
out, as an idler bracket will be bolted on after the
sledge frame is installed in the baler.
NOTE:
Be sure to position end shield, 3, with the
screw exposed in the slot. The screw is required to
rotate the shield to align the holes for the bolts.
2. Assemble the other side in a similar manner, and
install and torque all three cap screws.
3. Center roll, 1, Figure 19, between sledge frame
assembly, 2. Tighten the lock collars, 3.
4. Assemble the pivot roll, 2, Figure 24, and install
it back in the baler.
2
4
19993449
3
1
2
5
25
5. Install the sledge frame assembly in the baler.
Use a longer M10 bolt, 1, and a drift punch, 2, to
line up the frame with the bearing flangettes and
shield on the roll. The cap screw and washer, 3,
can now be installed. Remove drift punch, 2, and
install a cap screw and washer. Torque the cap
screws, 2 and 3, to 52 N
⋅
m (38 ft. lbs.).
Remove the long bolt. Install the remaining
cap screw and washer and torque it to 52 N
⋅
m
(38 ft. lbs.).
2
19993450
3
1
26
Summary of Contents for RBX443
Page 1: ...5 5RXQG DOHU 5HSDLU 0DQXDO...
Page 12: ......
Page 42: ...SECTION 00 GENERAL INFORMATION CHAPTER 1 00 30...
Page 60: ...SECTION 31 IMPLEMENT DRIVELINE CHAPTER 1 31 18...
Page 82: ...SECTION 31 IMPLEMENT DRIVELINE CHAPTER 2 31 22...
Page 90: ...SECTION 35 HYDRAULIC SYSTEM CHAPTER 1 35 8...
Page 100: ...SECTION 55 ELECTRICAL SYSTEMS CHAPTER 1 55 10...
Page 113: ...SECTION 55 ELECTRICAL SYSTEMS CHAPTER 3 55 9 BALER LIGHTS WIRING DIAGRAM 17...
Page 114: ...SECTION 55 ELECTRICAL SYSTEMS CHAPTER 3 55 10...
Page 124: ...SECTION 62 PRESSING CHAPTER 1 62 2 SECTIONAL VIEWS FLOOR ROLL 1...
Page 128: ...SECTION 62 PRESSING CHAPTER 1 62 6...
Page 130: ...SECTION 62 PRESSING CHAPTER 2 62 2 SECTIONAL VIEWS STARTER ROLL 1...
Page 134: ...SECTION 62 PRESSING CHAPTER 2 62 6...
Page 150: ...SECTION 62 PRESSING CHAPTER 3 62 16...
Page 164: ...SECTION 62 PRESSING CHAPTER 4 62 14...
Page 178: ...SECTION 62 PRESSING CHAPTER 5 62 14...
Page 196: ......