Unpacking
Unpacking Procedure
NOTE:
This equipment is packed using tapes, fixings and cushioning materials to be protected vibration and shock during transportation.
Be sure to remove all the fixing materials and the tapes before starting to install this equipment. It is a good idea to store away
theremoved fixings and cushioning materials for possible relocation of this equipment, e.g., to new site or for repairs.
1.
Take out the finisher from the carton.
NOTE:
The weight of this equipment is about 7.0kg.
2.
Remove all the tapes and the cushioning materials outside this equipment.
3.
4.
7. Installation
94
Summary of Contents for Inner Finisher-K1
Page 1: ...Revision 3 0 Inner Finisher K1 Service Manual ...
Page 10: ...Product Overview 1 Features 5 Specifications 6 Name of Parts 9 ...
Page 47: ...Periodical Service 3 Periodic Servicing Tasks 42 ...
Page 94: ...Troubleshooting 6 Making Initial Checks 89 Processing Tray Area 90 ...
Page 109: ...11 1x 12 7 Installation 103 ...
Page 112: ...APPENDICES Service Tools 107 General Circuit Diagram 108 ...