Checking Before Installation
Checking the Installation Space
Requirements for the installation place are given below.
100mm or more
500mm or more
Check Items when Turning OFF the Main Power
Check that the main power switch is OFF.
1. Turn OFF the main power switch of the Host Machine.
2. Be sure that control panel display and main power lamp are both turned OFF, and then disconnect the power plug from the
outlet.
Points to Note at Installation
• Marked portion
When tightening the screws, do not tighten them too tightly. Otherwise, there is a risk of damage and deformation of screw
holes.
7. Installation
92
Summary of Contents for Inner Finisher-K1
Page 1: ...Revision 3 0 Inner Finisher K1 Service Manual ...
Page 10: ...Product Overview 1 Features 5 Specifications 6 Name of Parts 9 ...
Page 47: ...Periodical Service 3 Periodic Servicing Tasks 42 ...
Page 94: ...Troubleshooting 6 Making Initial Checks 89 Processing Tray Area 90 ...
Page 109: ...11 1x 12 7 Installation 103 ...
Page 112: ...APPENDICES Service Tools 107 General Circuit Diagram 108 ...