![Canon CXDI-60G Service Manual Download Page 110](http://html1.mh-extra.com/html/canon/cxdi-60g/cxdi-60g_service-manual_4009843110.webp)
2. Installation
94
7.7 Image Quality
(1) Purpose
This procedure is used to check the final image quality of the CXDI.
1) Resolution
check
Tools used
(1) Phantom
(2) High-resolution monitor or DICOM printer
Procedure
Procedure/Item Operation/Conditions
1. Adjust the distance between the focal point of the X-
ray tube and the CXDI imaging unit.
X cm: Differs according to the grid being used.
2. Perform calibration
SYSTEM > CALIBRATION
3. Perform self-test.
SYSTEM > SELF TEST
Must pass all the tests.
X-ray tube focal
point
X cm
Right angle at
the center
CXDI Sensor Unit
Self-test
[Positioning]
Position the X-ray tube and
CXDI Imaging Unit
Calibration
Summary of Contents for CXDI-60G
Page 23: ...2 Installation 7 2 CXDI System II assembly package Accessories box Power box ...
Page 115: ...2 Installation Manual 99 2 Power Box Mass 3 7 Kg Unit mm Dimension tolerance 1 Scale 1 N ...
Page 161: ...4a Canon Inc PWB 60 X RAY 1 2 SCHEMATIC DIAGRAM Rev 01 ...
Page 162: ...4b Canon Inc PWB 60 X RAY 2 2 SCHEMATIC DIAGRAM Rev 01 ...