4-38 SmartCell ZX-250 User Guide
Performing Hardware Maintenance
Switch Administration
.
Figure 4-10 Line up module on the nylon card guides.
••
Thumbs on front, hands supporting card, push card in with even pressure (see Figure 4-11) until it
seats into its backplane connector. Make sure the module is inserted into the chassis as far as it can
go before using the extractor lever arms.
Summary of Contents for SmartCell ZX-250
Page 12: ...xii SmartCell ZX 250 User Guide Table of Contents...
Page 16: ...xvi SmartCell ZX 250 User Guide List of Tables...
Page 18: ...1 2 SmartCell ZX 250 User Guide Introduction...
Page 46: ...3 8 SmartCell ZX 250 User Guide Creating an Emulated LAN IP Over ATM and LANE...
Page 92: ...4 46 SmartCell ZX 250 User Guide Performing Hardware Maintenance Switch Administration...
Page 98: ...5 6 SmartCell ZX 250 User Guide Troubleshooting Congestion Troubleshooting...
Page 110: ...A 12 SmartCell ZX 250 User Guide Acronyms...
Page 124: ...C 8 SmartCell ZX 250 User Guide Managing the SmartCell ZX 250 Agent Support...