4-4 SmartCell ZX-250 User Guide
ATM Routing
Switch Administration
2
p›F
Dotted lines in the diagrams below represent one-way routes to the devices
pointed to by the arrowheads. Each route is defined on the device from which the
dotted line originates.
Figure 4-1 IISP route across PNNI domain
A second IISP device (Switch D) is added behind Switch A. If Switch D also needs to reach Switch C for LECS
support, you must define additional IISP routes between Switches D and C, B and D, and A and D. Figure 4-2 shows
the typical “route to every point reached” IISP topology.
Figure 4-2 Routes needed for a second IISP switch
A
B
C
LEC
LECS
Physical link
IISP route
IISP Domain
PNNI Domain
B
C
LECS
A
LEC
D
Physical link
IISP route
LEC
IISP Domain
PNNI Domain
Summary of Contents for SmartCell ZX-250
Page 12: ...xii SmartCell ZX 250 User Guide Table of Contents...
Page 16: ...xvi SmartCell ZX 250 User Guide List of Tables...
Page 18: ...1 2 SmartCell ZX 250 User Guide Introduction...
Page 46: ...3 8 SmartCell ZX 250 User Guide Creating an Emulated LAN IP Over ATM and LANE...
Page 92: ...4 46 SmartCell ZX 250 User Guide Performing Hardware Maintenance Switch Administration...
Page 98: ...5 6 SmartCell ZX 250 User Guide Troubleshooting Congestion Troubleshooting...
Page 110: ...A 12 SmartCell ZX 250 User Guide Acronyms...
Page 124: ...C 8 SmartCell ZX 250 User Guide Managing the SmartCell ZX 250 Agent Support...