5 | Installation
Büchi Labortechnik AG
30/102
Operation Manual Pure Chromatography Instruments
5.14
Assembling the gas connection (option)
Precondition:
R
The gas supply complies with the
specifications. See Chapter 3.5 "Technical
data", page 18
u
Cut 50 mm from the gas tubing.
u
Attach the cut tubing to the air filter.
u
Secure the tubing in place.
u
Attach the tubing from gas supply to the other
side of the air filter.
u
Secure the tubing in place.
u
Connect the tubing from the gas supply to the
instrument.
All manuals and user guides at all-guides.com