4-8
User Manual
•
Connect the auxiliary gas supply line to the four-way adapter assembly using the quick-
connect connector located on the end of the auxiliary gas supply line.
•
Connect the opposite end of the auxiliary gas supply line to the second argon cylinder by
securing the end of the auxiliary line to the cylinder connection.
•
Open the primary cylinder valve first and use this cylinder until depleted. Do not open the
cylinder valve on the second cylinder until the initial cylinder has been depleted.
•
Reference Section 4.5 for instructions on changing the gas cylinder during a procedure, if the
second cylinder is also depleted during the procedure.
2
3
1
Figure 4-3. EZ-Connect2 Dual Cylinder Adapter
1
Auxiliary Gas Supply Line
2
Four-way Adapter Assembly with
Pressure Gauge
3
Gas Supply Line
CAUTION.
Before beginning the cryoablation procedure, ensure availability of sufficient gas to
conduct the planned cryoablation procedure (reference Section 8.5 for gas purity requirements).
10. Ensure the
Gas Indicator
(Screen 3-4) displays the minimum working pressure before initiating a
Gas Indicator
should indicate the pressure to be in the green range.
If the system detects that the pressure reading for either gas cylinder is less than 50 psi, a
message displays on the
Navigation Tool Bar
(Screen 4-8). Connect the gas cylinders to the
Visual-ICE System.
Summary of Contents for Visual-ICE
Page 1: ...User Manual ...
Page 10: ...viii User Manual This page intentionally left blank ...
Page 22: ...1 10 User Manual This page intentionally left blank ...
Page 30: ...2 8 User Manual This page intentionally left blank ...
Page 76: ...4 30 User Manual This page intentionally left blank ...
Page 114: ...7 32 User Manual This page intentionally left blank ...
Page 122: ...9 2 User Manual This page intentionally left blank ...
Page 124: ...10 2 User Manual This page intentionally left blank ...
Page 125: ......