Chapter 1 Machine Preparation
BAS-6150
17
3-7. Air pressure setting
When adjustment has to be done with the power switch and air pressure on, pay enough attention to
safety.
Detach the air tube of air source and set the pointer of the pressure gauge to [0] for inspection,
adjustment, and repair of devices using air.
1.
Joint rubber hose
q
to union
e
of air unit
w
.
2.
Turn handle
r
while pulling up it to set air
pressure to 0.49 Mpa.
3.
When water is noticed in bottle
t
, drain
water by pressing the button of the drain
cock
y
.
(Note) When bulb
u
is opened, pay due attention to
movement of the stacker bar.
q
w
e
r
u
t
y
CAUTION
1446S
1447S
Summary of Contents for BAS-6150
Page 2: ......
Page 11: ...Chapter 1 Machine Preparation ...
Page 29: ...Chapter 2 Sewing flow ...
Page 41: ...Chapter 3 Settings ...
Page 55: ...Chapter 4 Oiling ...
Page 59: ...Chapter 5 Adjustment For raising the head refer to 3 How to raisethehead in Chapter4 Oiling ...
Page 70: ...Chapter 5 Adjustment BAS 6150 68 ...
Page 71: ...Chapter 6 Knife replacement ...
Page 77: ...Chapter 7 Environment setting ...
Page 85: ...Chapter 7 Environment setting BAS 6150 83 Standard stacker 4 steps 0 1 3 4 2 1530S ...
Page 95: ...Chapter 8 Dipswitch ...
Page 98: ...Chapter 8 Dipswitch BAS 6150 96 ...
Page 99: ...Chapter 9 Error code List ...
Page 103: ...Chapter 10 Troubleshooting ...