
Effectivity: 912 i Series
Edition 1/Rev. 0
d0
534
5.
fm
MAINTENANCE MANUAL
BRP-Powertrain
72-30-00
Page 22
July 01/2012
Fig. 31
COOLANT ELBOW - INSTALLATION
Fig. 32
VALVE INSTALLATION
Fig. 33
1. Coolant elbow
2. Elbow flange
Step
Procedure
1
Install a new 19x2 O-ring in the cylinder
head.
2
Fasten the coolant elbow with 2 M6x20
Allen screws and 6.4 lock washers.
Tightening torque 10 Nm (88.48 in. lb.).
NOTE:
Install the cable brackets on
cylinder 2/4.
1. M6x20 Allen screws
2. 6.4 washers
3. Elbow flange
4. 19x2 O-ring
5. Cable brackets
m
WARNUNG
NOTICE
Risk of engine damage if damaged parts are in-
stalled!
All parts must be measured and assessed befo-
re installation.
All moving parts must be lubricated with engine
oil before installation!
m
WARNUNG
NOTICE
Oil residues up to max. 20% of the running sur-
face are permissible.
Step
Procedure
1
Push 16/27.9/1 onto the valve guide and
install a new valve stem seal on the intake
side.
2
Lubricate the valve stem and push the in-
take valve from outside into the valve
guide.
1. 16/27.9/1 washer
2. Intake valve
3. Valve spring retainer
4. Valve stem seal
Step
Procedure
3
Install the valve springs and the valve
spring retainer
Summary of Contents for Rotax 912 i Series
Page 457: ......