
Effectivity: 912 i Series
Edition 1/Rev. 3
d0
667
2.
fm
MAINTENANCE MANUAL
BRP-Rotax
72-10-00
Page 24
July 01/2018
ASSEMBLY
Preparation
-
Heat the gearbox housing with hot air (or in
an oven) to approx. 100 to 120°C
(212 °F-
248 °F)
.
INSTALLATION OF OIL SPRAY NOZZLE
ASSY.
Fig. 33
INSTALLATION OF BALL BEARING
Fig. 34
m
WARNUNG
m
WARNING
Danger of severe burns and scalds! Wear heat-
resistant gloves!
Step
Procedure
1
Insert the oil spray nozzle with the banjo
bolt M8x1.
The oil spray jet must point to the step col-
lar.
2
Secure the M8x1Banjo bolt with
LOCTITE 243.
Tightening torque 20 Nm (15 ft.lb.)
1. Oil spray nozzle and Banjo bolt M8x1
Step
Procedure
1
Press the oil seal into the gearbox hous-
ing from the inside using insertion jig part
no. 876518.
NOTE:
Lubricate sealing lips with en-
gine oil.
2
Insert the 36/50/5.5 spacer ring with the
radius facing the oil seal.
3
Insert the ball bearing. (The cage must be
visible.)
NOTE:
The ball bearing must drop into
the bearing position under its
own weight!
4
Screw in 4 M7x16 hex. screws with hard-
ened 7.2/18.8/3 washers.
Tightening torque 15 Nm (133 in. lb.).
NOTE:
Secure screws with LOCTITE
243!
Summary of Contents for Rotax 912 i Series
Page 457: ......