Orion ISS
www.bolid.com
90
TECHNICAL INSPECTIONS
To make sure your S2000-2 controller keeps proper operability it must be inspected by a competent
specialist at least on receipt and annually. The inspection algorithm shall include:
−
Visual checking S2000-2 for contaminations and mechanical damage
−
Verifying S2000-2 for secure mounting and wire connection conditions
−
Inspection of S2000-2 operability in accordance with the techniques shown below
The S2000-2 controller must be tested under the following ambient conditions:
−
Temperature 25
°
± 10
°
C
−
Relative humidity 45 ÷ 80 %
−
Atmospheric pressure 630 ÷ 800 mm Hg
WARNING! Disconnect the S2000-2 controller power supply before wiring and
unwiring the device while testing
NOTE: Technical readiness period of the S2000-2 does not exceed 5s
The wiring diagram for the controller operability inspection is shown in Figure 18
.
S2000-2 Operability Inspection
Inspect the controller operability by doing the following:
1. Remove the controller cover and power the controller on.
2. Ensure the controller makes a sound
3. Measure the consumed current value; it must not exceed 120mA.
4. Ensure the network controller displays the event of controller being found.
Summary of Contents for S2000-2
Page 1: ...Orion ISS Access Controller S2000 2 User s Manual ISO 9001 ...
Page 5: ...S2000 2 Features and Design 5 www bolid com FEATURES AND DESIGN ...
Page 8: ...Orion ISS www bolid com 8 ...
Page 9: ...S2000 2 Specifications 9 www bolid com SPECIFICATIONS ...
Page 12: ...Orion ISS www bolid com 12 ...
Page 13: ...S2000 2 Operating 13 www bolid com OPERATING ...
Page 47: ...S2000 2 Installation 47 www bolid com INSTALLATION ...
Page 67: ...S2000 2 S2000 2 Programming 67 www bolid com S2000 2 PROGRAMMING ...
Page 89: ...S2000 2 Maintenance 89 www bolid com MAINTENANCE ...
Page 94: ...Orion ISS www bolid com 94 ...
Page 95: ...S2000 2 95 www bolid com Appendix Connecting Some Models of Readers to the S2000 2 Controller ...