18 Phenix green
PH
40 ou 80 mm
100 mm
30 mm
PH
8. FRAME (optional)
The 4 mm frame must be placed before brickwork is done. The inner frame must be positioned
before fi nishing when using the 30 mm frame. The 30 mm frame is placed after dressing masonry.
The 4 mm frame and the 30 mm inner frame are fastened to the fi replace with four screws.
The 30 mm frame is simply clipped to the inner frame (once fi nishing masonry has been done).
Frame 4 mm
(depth 40 mm or 80 mm)
Phenix 75: 615 x 494 mm
Phenix 85: 714 x 614 mm
Phenix 95: 814 x 494 mm
Phenix 120: 1064 x 494 mm
Frame 30 mm
(depth 100 mm)
Phenix 75: 624 x 511 mm
Phenix 85: 723 x 631 mm
Phenix 95: 823 x 511 mm
Phenix 120: 1073 x 511 mm
Take into account the measures of the frame (or inner-frame) before proceeding with masonry or
any other covering material.