2 Safety Manual / Explosion Protection Manual
LB 6775
30
63039BA26, Rev. 03, 07/2018
2.10
Maintenance and Visual Inspection
1
2
3
4
Cover
Gable gland
Base
O-Ring
Fig. 4
Detector Housing with Connection head
IMPORTANT
During commissioning, maintenance or repair, always use the check lists in chap-
ter 2.11 and 2.12, in order to document the accuracy and completeness of your
work.
Visual Inspection
Regularly perform a visual inspection at least once every three years. To do this,
use the plan for the visual inspection from chapter 2.11. Initiate immediate appro-
priate measures if you discover damage during visual inspection. If necessary, im-
mediately disconnect the detector from the power supply.
When determining the intervals for the visual inspection, the following conditions
are to be considered:
•
ambient conditions (temperature, humidity, corrosive atmosphere, shock
and vibration).
•
operating conditions (utilization, incorrect operation).
•
major changes in the whole system (e.g. changes in the classification of ex-
plosion protection zones).
Summary of Contents for LB 6775
Page 1: ...Detectors LB 6775 Operating Manual 63039BA2 Rev No 01 07 2018...
Page 2: ......
Page 4: ......
Page 36: ...2 Safety Manual Explosion Protection Manual LB 6775 36 63039BA26 Rev 03 07 2018...
Page 38: ...2 Safety Manual Explosion Protection Manual LB 6775 38 63039BA26 Rev 03 07 2018...
Page 39: ...LB 6775 2 Safety Manual Explosion Protection Manual 63039BA26 Rev 03 07 2018 39...
Page 40: ...2 Safety Manual Explosion Protection Manual LB 6775 40 63039BA26 Rev 03 07 2018...
Page 42: ...2 Safety Manual Explosion Protection Manual LB 6775 42 63039BA26 Rev 03 07 2018...
Page 43: ...LB 6775 2 Safety Manual Explosion Protection Manual 63039BA26 Rev 03 07 2018 43...
Page 44: ...2 Safety Manual Explosion Protection Manual LB 6775 44 63039BA26 Rev 03 07 2018...
Page 46: ...2 Safety Manual Explosion Protection Manual LB 6775 46 63039BA2 Rev 01 07 2018...
Page 62: ...6 Operation LB 6775 62 63039BA2 Rev 01 07 2018 Identification Fig 16 Page Identification...
Page 79: ...LB 6775 6 Operation 63039BA2 Rev 01 07 2018 79...
Page 84: ...LB 6775 LB 6775 Technical Information Technische Information 63039TI Rev No 01 07 2018...
Page 102: ...Technical Information LB 6775 Technische Information LB 6775 63039TI Rev 01 07 2018...
Page 104: ...Technical Information LB 6775 Technische Information LB 6775 63039TI Rev 01 07 2018...
Page 106: ...Technical Information LB 6775 Technische Information LB 6775 63039TI Rev 01 07 2018...
Page 107: ...Technical Information LB 6775 Technische Information LB 6775 63039TI Rev 01 07 2018...
Page 108: ...Technical Information LB 6775 Technische Information LB 6775 63039TI Rev 01 07 2018...
Page 110: ...Technical Information LB 6775 Technische Information LB 6775 63039TI Rev 01 07 2018...
Page 112: ...Technical Information LB 6775 Technische Information LB 6775 63039TI Rev 01 07 2018...
Page 113: ...Technical Information LB 6775 Technische Information LB 6775 63039TI Rev 01 07 2018...
Page 114: ...Technical Information LB 6775 Technische Information LB 6775 63039TI Rev 01 07 2018...
Page 116: ...Technical Information LB 6775 Technische Information LB 6775 63039TI Rev 01 07 2018...
Page 117: ...Technical Information LB 6775 Technische Information LB 6775 63039TI Rev 01 07 2018...
Page 118: ...Technical Information LB 6775 Technische Information LB 6775 63039TI Rev 01 07 2018...