4. Commissioning
4.
01
Prior to lifting the machine,
ensure that the COMPACTION
BOX is disconnected from the
mains.
Pull the remote control plug prior
to lifting (optional).
For machines with a LIFT-TILT-
DEVICE or a cover hood, move
these to their transport position
first (optional).
1) Transport the PACK-BIN to a site with
solid, level ground.
You will find special hooks at the front side
and at the discharge opening of the unit.
2) Check to see if the mains voltage is the same
as the machine voltage.
You will find this information on a sticker
at the front side of the unit.
( e.g. in case of 380V, 50 Hz )
Commissioning must only be carried out by a BERGMANN
authorized dealer.
The following instructions have to be observed for the commissioning and in case of a later change in
location:
Electricity supply
O 220 - 240 V 3 ~
O 380 - 415 V 3 ~
O 480 V 3 ~
Frequency
O 50 Hz
O 60 Hz
Main fuse (by user)
3 x 25 A
Power rating
O 5,5 kW
O 7,5 kW
Protection
IP 44
Summary of Contents for ALPHA-PACK-BIN
Page 2: ......
Page 6: ......
Page 16: ......
Page 20: ......
Page 28: ......
Page 34: ......
Page 50: ......
Page 52: ......
Page 53: ...10 Dimensions 10 01 Illustration standard version deviations are possible ...
Page 54: ......
Page 60: ......
Page 64: ......
Page 66: ......
Page 68: ......
Page 70: ......
Page 72: ......
Page 74: ......
Page 76: ......
Page 78: ......
Page 80: ......
Page 82: ......
Page 84: ......
Page 86: ......
Page 88: ......
Page 90: ......
Page 92: ......
Page 94: ......
Page 96: ......