Universal Optical Drill Grinder
Operator's Manual Issue 06/01 Rev 02
4
Connection
Electrical connection
Note the information on the nameplate at the machine rear.
220 V, 50 Hz or
110 V, 60 Hz
Installing the machine
In order to work optimal with MEGA-POINT, the following requirements must be met.
Space requirements
The minimum distances indicated in the drawing must be kept.
Location requirements
MEGA-POINT on stand (option)
The stand must be placed on a level, hard surface.
Make sure that the stand has a firm footing and does not wobble.
MEGA-POINT without stand
A steady table is sufficient as a surface. Make sure that the machine has a firm footing and does not wobble.
To ensure good ventilation of the machine, do not place it on a soft surface (foam).
Delivery, transportation and installation