BHT-222/222B-MM-1
5-00-00
9 SEP 2011 Rev. 7
Page 63
ECCN EAR99
SCHEDULED INSPECTIONS
5-23.
PROGRESSIVE INSPECTION — EVENT 8
DATA REFERENCE
INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
DATE: __________________W.O. _____________________
FACILITY: __________________________________________
HELICOPTER S/N: ___________________________________
REGISTRY NO.: _____________________________________
TOTAL TIME:_______________________________________
SIGNATURE:_______________
_________________________
GENERAL
1.
Perform a complete 50-hour inspection.
DETAIL
Chapter 66
1.
Inspect right and left nodal beam assembly as follows:
a.
Flexure assembly for cracks in fiberglass, shear pad
debond/delamination, security. F5/F6
b.
Cam bearing for evidence of grease loss, overheating,
and grease seal condition. F5/F6
c.
Weight and cam arms for indications of misalignment
and chafing. F5/F6
d.
Restraint arms and lift links for security, damage, and
elastomeric bearings for obvious damage. F5/F6
e.
Visually inspect the outside surfaces of station 270
bulkhead at and around the area of attachment fittings
222-031-592-101 to the bulkhead for cracks and damage.
Summary of Contents for 222
Page 6: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 24: ...BHT 222 222B MM 1 5 00 00 Page 6 Rev 7 9 SEP 2011 ECCN EAR99 Figure 5 1 Maintenance Zones ...
Page 26: ......
Page 48: ......
Page 60: ......
Page 66: ......
Page 70: ......
Page 74: ......
Page 80: ......
Page 84: ......
Page 106: ......
Page 108: ......
Page 110: ......
Page 118: ......
Page 120: ......
Page 122: ......
Page 126: ......
Page 128: ......
Page 132: ......
Page 136: ......
Page 138: ......
Page 140: ......
Page 142: ......
Page 144: ......
Page 146: ......
Page 148: ......
Page 150: ......
Page 154: ......
Page 156: ......
Page 158: ......
Page 166: ......
Page 174: ......
Page 180: ......
Page 186: ......
Page 190: ......
Page 196: ......