BHT-222/222B-MM-1
5-00-00
Page 96
Rev. 7 9 SEP 2011
ECCN EAR99
BHT-ALL-SPM
g.
If no rotation of the drive pin(s) is observed, inspect the
pin(s) for visible damage. Repair any raised material on the
wrenching flats of the drive pin(s) and refinish rework areas as
required.
8.
Inspect swashplate and lever assembly paying particular
attention to ball sleeve and slider assemblies as follows:
a.
Tilt the swashplate to one side and subsequently to the
opposite side to expose each slider in turn. While viewing each
slider, apply a rotational force to the swashplate non-rotating
ring in alternating directions. Carefully observe the slider bolt,
looking for radial movement. Any evidence of radial movement
or fretting residue will require further disassembly of the
swashplate for inspection and repair.
b.
Inspect ball sleeve assembly for evidence of debonding
or fretting of upper and lower sleeves. Any evidence of
looseness or fretting residue will require further disassembly of
swashplate for inspection and repair.
c.
Move ball sleeve up and down through full range of
travel and inspect swashplate support for surface damage and
evidence of radial play between ball sleeve assembly and
support. Surface damage and/or evidence of radial play will
require further disassembly of swashplate for inspection and
repair.
ENGINE STARTER GENERATOR
BHT-222-CR&O-V.2
NOTE
Inspection intervals may be established per the
manufacturer’s recommendations, as an alternate
means of compliance.
Chapter 96
1.
Inspect right engine starter generator brushes for wear
down to the diagonal groove wear indicator. E2
Chapter 96
2.
Inspect left engine starter generator brushes for wear down
to the diagonal groove wear indicator. E1
SCHEDULED INSPECTIONS
5-32.
EVERY 300 HOURS OF COMPONENT OPERATION (CONT)
DATA REFERENCE
INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
Summary of Contents for 222
Page 6: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 24: ...BHT 222 222B MM 1 5 00 00 Page 6 Rev 7 9 SEP 2011 ECCN EAR99 Figure 5 1 Maintenance Zones ...
Page 26: ......
Page 48: ......
Page 60: ......
Page 66: ......
Page 70: ......
Page 74: ......
Page 80: ......
Page 84: ......
Page 106: ......
Page 108: ......
Page 110: ......
Page 118: ......
Page 120: ......
Page 122: ......
Page 126: ......
Page 128: ......
Page 132: ......
Page 136: ......
Page 138: ......
Page 140: ......
Page 142: ......
Page 144: ......
Page 146: ......
Page 148: ......
Page 150: ......
Page 154: ......
Page 156: ......
Page 158: ......
Page 166: ......
Page 174: ......
Page 180: ......
Page 186: ......
Page 190: ......
Page 196: ......