BHT-222/222B-MM-1
5-00-00
Page 70
Rev. 7 9 SEP 2011
ECCN EAR99
Chapter 65
BHT-222-CR&O-2
25.
For all main rotor hub assemblies, verify torque of main
rotor grip(s) retaining bolts/nuts. Apply 100 foot-pounds
(135 Nm) of torque to the nut, in the tightening direction.
Provided 100 foot-pounds (135 Nm) of torque is reached
without movement of the nut, torque the bolt/nut to
125 foot-pounds (169 Nm). If any nut moves before
100 foot-pounds (135 Nm) of torque is reached, remove grip
from main rotor hub assembly. Inspect/repair pitch horn and grip
assemblies. R1
SCHEDULED INSPECTIONS
5-24.
PROGRESSIVE INSPECTION — EVENT 9 (CONT)
DATA REFERENCE
INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
Summary of Contents for 222
Page 6: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 24: ...BHT 222 222B MM 1 5 00 00 Page 6 Rev 7 9 SEP 2011 ECCN EAR99 Figure 5 1 Maintenance Zones ...
Page 26: ......
Page 48: ......
Page 60: ......
Page 66: ......
Page 70: ......
Page 74: ......
Page 80: ......
Page 84: ......
Page 106: ......
Page 108: ......
Page 110: ......
Page 118: ......
Page 120: ......
Page 122: ......
Page 126: ......
Page 128: ......
Page 132: ......
Page 136: ......
Page 138: ......
Page 140: ......
Page 142: ......
Page 144: ......
Page 146: ......
Page 148: ......
Page 150: ......
Page 154: ......
Page 156: ......
Page 158: ......
Page 166: ......
Page 174: ......
Page 180: ......
Page 186: ......
Page 190: ......
Page 196: ......