BHT-222/222B-MM-1
5-00-00
Page 78
Rev. 7 9 SEP 2011
ECCN EAR99
BHT-222-CR&O-2
15.
Visually inspect the accessible portion of the main rotor
elastomeric pitch axis bearings, trunnion bearings, and flapping
springs for evidence of delamination or loss of elastomer. R1
Chapter 65
16.
lnspect main rotor blades for obvious damage and for
cleanliness. R1
Chapter 27
BHT-ALL-SPM
17.
lnspect roof mounted cyclic and collective shaft assemblies
and control tubes for bearing corrosion or mechanical damage,
wear, and security of attachment. F5/F6
NOTE
Examine inspection window(s) and/or glass(es) for
cracking and discoloration. If either of these
conditions are present, the part must be removed
and replaced prior to returning helicopter for service.
Chapter 29
18.
lnspect hydraulic lines for leaks, system PC-1 and PC-2
reservoirs for proper level and discoloration of fluid, and module
for differential pressure indication. Check for chafe guard
deterioration, and verify flexible hoses are in satisfactory
condition and exhibit no indications of chafing. F5/F6
SCHEDULED INSPECTIONS
5-26.
PROGRESSIVE INSPECTION — EVENT 11 (CONT)
DATA REFERENCE
INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
Summary of Contents for 222
Page 6: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 24: ...BHT 222 222B MM 1 5 00 00 Page 6 Rev 7 9 SEP 2011 ECCN EAR99 Figure 5 1 Maintenance Zones ...
Page 26: ......
Page 48: ......
Page 60: ......
Page 66: ......
Page 70: ......
Page 74: ......
Page 80: ......
Page 84: ......
Page 106: ......
Page 108: ......
Page 110: ......
Page 118: ......
Page 120: ......
Page 122: ......
Page 126: ......
Page 128: ......
Page 132: ......
Page 136: ......
Page 138: ......
Page 140: ......
Page 142: ......
Page 144: ......
Page 146: ......
Page 148: ......
Page 150: ......
Page 154: ......
Page 156: ......
Page 158: ......
Page 166: ......
Page 174: ......
Page 180: ......
Page 186: ......
Page 190: ......
Page 196: ......