BHT-222/222B-MM-1
5-00-00
9 SEP 2011 Rev. 7
Page 13
ECCN EAR99
NOTE
Retorque is not required if flapping springs
222-310-117-105 are installed.
BHT-222-CR&O-2
9.
Verify torque of main rotor trunnion bolts in the tightening
direction, minimum 45 foot-pounds (61 Nm). Provided
45 foot-pounds (61 Nm) is reached without movement of bolts,
torque bolts to 53 foot-pounds (72 Nm). If any bolt moves
before 45 foot-pounds (61 Nm) is reached, remove all six bolts
and visually inspect for cracks or signs of yielding. If any
defective bolts are found, replace all six bolts. If no defect(s)
are found, reinstall bolts. R1
Chapter 65
BHT-222-CR&O-2
10.
For all main rotor hub assemblies, verify torque of main
rotor flapping bearing(s) retaining bolt/nuts. Apply
100 foot-pounds (135 Nm) of torque to the nut, in the tightening
direction. Provided 100 foot-pounds (135 Nm) of torque is
reached without movement of the nut, torque the bolt/nut to
125 foot-pounds (169 Nm). If any nut moves before
100 foot-pounds (135 Nm) of torque is reached, remove
flapping bearing from main rotor hub assembly. Inspect/repair
flapping bearing and main rotor yoke assemblies. R1
Chapter 65
11.
(Model 222) Inspect main rotor blade 222-015-500-101/
-105 upper and lower center spar doublers for debonding.
Chapter 71
12.
If installed, inspect external engine oil filters for impending
bypass. E1/E2
Chapter 29
13.
lnspect tail rotor control actuator for evidence of bearing
wear, security of attachment, and evidence of leakage. F3/F4
Chapter 65
BHT-ALL-SPM
14.
lnspect tail rotor pitch links for worn bearings and freedom
of operation. R2
15.
Remove all chip detectors from engine oil systems; i.e.,
flow, accessory gearbox, and the No. 2 and No. 3 bearing
scavenge line. F5/F6, E1/E2
Honeywell Service
Bulletin
LT 101-77-30-0104
a.
Inspect each chip detector for metal contamination.
SCHEDULED INSPECTIONS
5-13.
50-HOUR INSPECTION (CONT)
DATA REFERENCE
INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
Summary of Contents for 222
Page 6: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 24: ...BHT 222 222B MM 1 5 00 00 Page 6 Rev 7 9 SEP 2011 ECCN EAR99 Figure 5 1 Maintenance Zones ...
Page 26: ......
Page 48: ......
Page 60: ......
Page 66: ......
Page 70: ......
Page 74: ......
Page 80: ......
Page 84: ......
Page 106: ......
Page 108: ......
Page 110: ......
Page 118: ......
Page 120: ......
Page 122: ......
Page 126: ......
Page 128: ......
Page 132: ......
Page 136: ......
Page 138: ......
Page 140: ......
Page 142: ......
Page 144: ......
Page 146: ......
Page 148: ......
Page 150: ......
Page 154: ......
Page 156: ......
Page 158: ......
Page 166: ......
Page 174: ......
Page 180: ......
Page 186: ......
Page 190: ......
Page 196: ......