CHAMELEON® ARCH SERIES
20
Belanger, Inc. * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681
1MANUL526
Installation
Arch Assembly
11)
Spray Arch Only:
Place the spacer over the nipple on the top of the spray manifold
assembly and secure it with the 1/4-20 set screw as shown in the image.
The height of the horizontal manifold may need to be adjusted later in the installation to
accommodate the holes and the vertical filler strips.
Note:
Be sure the setscrew faces the exit of the tunnel.
12)
Spray Arch Only:
Apply Teflon tape and liquid Teflon to the threads of the nipple and
tighten
the supplied 1/2” (12.7 mm) coupling to the top spray manifold.
Before
After
Before
After