CHAMELEON® ARCH SERIES
52
Belanger, Inc. * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681
1MANUL526
Installation
Additional Options: Single K-Nozzle Manifolds
Single K-Nozzle Manifold Installation
20) Run the airlines through the half section of nylon protective sleeve for each leg. Refer to
the images below for more detail.
Note:
Make sure that the nylon protective sleeve is positioned so that it is not allowing the
airlines to rub any of the edges at the slotted area of the filler strip.
.
21) Push the 3/
8” (9.52 mm) airline that is coming from the main air feed union tee to the
elbow that is on the bottom of the side spray manifolds.
Note:
Route the airline to the elbow so that it is making a smooth transition from the point it
comes out of the filler strip to the connection point on the elbow.
22) Push the 3/
8” (9.52 mm) airline that is coming from the main water/chemical feed union
tee to the elbow that is on the top of the side spray manifolds.
Note:
Route the airline to the elbow so that it is making a smooth transition from the point it
comes out of the filler strip to the connection point on the elbow.
At this point everything has been installed on the Arch.
23) Turn on the main water and run it through the lines. Check to make sure that there are
no leaks at any point on the system.
Position the
sleeves here to
prevent the
airlines from
rubbing against
the filler strip.
Position the
sleeves here
to prevent
the airlines
from rubbing
against the
filler strip.