PN B10093AE
2-18
Operation
Setting Up an Elutriation Run
6
Close the door.
The rotor accelerates to the set speed.
a.
If you entered a loading speed other than 2000 RPM, re-enter the run speed after you close
the door
.
7
End the run.
•
When the run is complete (the run time has expired, the set
2
t
value has been reached, or
STOP
has been pressed), the rotor decelerates to the default unloading speed of 2000 RPM.
•
If desired, you may enter a different unloading speed of 3000 RPM or below after the rotor
reaches 2000 RPM.
8
Open the door and unload the rotor.
DANGER
Never try to slow or stop the rotor by hand.
9
Press
STOP
to bring the rotor to a complete stop.
NOTE
Before another zonal run can be started, you must press the
RESET
key.
Setting Up an Elutriation Run
Centrifuges equipped for elutriation have elutriation controls as shown in
and an
elutriation power box mounted on the back of the control panel. See the JE-5.0 elutriator rotor
manual (JE5-IM) for complete rotor setup and operating instructions.
Figure 2.1
Elutriation Controls
DELAY
ELUTRIATOR
DELAY
ELUTRIAT
OR
Summary of Contents for Avanti J-26S XPI
Page 4: ...PN B10093AE iv Revision History ...
Page 12: ...xii Contents Avanti J Series Centrifuge Warranty Related Documents ...
Page 14: ...xiv Illustrations ...
Page 16: ...xvi Tables ...
Page 20: ...PN B10093AE xx Introduction Multi Compliance Label ...
Page 36: ...PN B10093AE 1 16 Description Available Rotors ...
Page 66: ...PN B10093AE 3 10 Troubleshooting JCF Z Rotor Identification ...
Page 82: ...PN B10093AE A 10 Preinstallation Requirements Using J2 Series Rotors in the Avanti J 26S XPI ...
Page 86: ...PN B10093AE Warranty 2 Beckman Coulter Inc Avanti J Series Centrifuge Warranty ...
Page 87: ......