PN B10093AE
2-6
Operation
Manual Operation
•
The
RPM
indicator illuminates in the actual value display.
2
Enter the required RPM on the keypad and press
ENTER.
•
The speed is displayed in the
Speed:
field.
•
The system rounds off the last digit of the RPM entry, if necessary, and calculates and
displays the
g
-force applied to the rotor at that speed.
Entering RCF
1
Press
SPEED
RPM and
RCF
soft keys appear.
2
Press the
RCF
soft key.
ROTOR
TIME
TEMP
A/D
OPT
ROTOR ID
SPEED
RPM/RCF
TIME
HR:MIN
°C
TEMP
Rotor : JA-30.50
Speed : - - RPM = -- x G
Time : 00:00
Temp : 25°C Max Temp : 29°C
Accel : MAX Decel : MAX
RPM
RCF
RPM
SPEED
SPEED
TIME
TEMP
A/D
OPT
ROTOR
Rotor : JA-30.50
Speed : 26 000 RPM = -- x G
Time : 00:00
Temp : 25°C Max Temp : 29°C
Accel : MAX Decel : MAX
RPM
RCF
Summary of Contents for Avanti J-26S XPI
Page 4: ...PN B10093AE iv Revision History ...
Page 12: ...xii Contents Avanti J Series Centrifuge Warranty Related Documents ...
Page 14: ...xiv Illustrations ...
Page 16: ...xvi Tables ...
Page 20: ...PN B10093AE xx Introduction Multi Compliance Label ...
Page 36: ...PN B10093AE 1 16 Description Available Rotors ...
Page 66: ...PN B10093AE 3 10 Troubleshooting JCF Z Rotor Identification ...
Page 82: ...PN B10093AE A 10 Preinstallation Requirements Using J2 Series Rotors in the Avanti J 26S XPI ...
Page 86: ...PN B10093AE Warranty 2 Beckman Coulter Inc Avanti J Series Centrifuge Warranty ...
Page 87: ......