PN B10093AE
2-20
Operation
Setting Up an Elutriation Run
NOTE
At the end of the run, after disassembling the liquid and power lines, be sure to replace the black
rubber stoppers in the ports at the left side of the centrifuge door. Failure to seal these openings will
prevent proper operation of the FRS system, which will cause a diagnostic shut down during the
next run.
1.
Delay Control Knob
DELAY
ELUTRIATOR
1
Summary of Contents for Avanti J-26S XPI
Page 4: ...PN B10093AE iv Revision History ...
Page 12: ...xii Contents Avanti J Series Centrifuge Warranty Related Documents ...
Page 14: ...xiv Illustrations ...
Page 16: ...xvi Tables ...
Page 20: ...PN B10093AE xx Introduction Multi Compliance Label ...
Page 36: ...PN B10093AE 1 16 Description Available Rotors ...
Page 66: ...PN B10093AE 3 10 Troubleshooting JCF Z Rotor Identification ...
Page 82: ...PN B10093AE A 10 Preinstallation Requirements Using J2 Series Rotors in the Avanti J 26S XPI ...
Page 86: ...PN B10093AE Warranty 2 Beckman Coulter Inc Avanti J Series Centrifuge Warranty ...
Page 87: ......