Commissioning
Fig. 172:
Process Data tab SM3, EL72x1-0010 (default)
PDO Assignment
In order to configure the process data, select the desired Sync Manager (SM 2 & 3 can be edited) in the
upper left-hand "Sync Manager" box (see fig.). The process data assigned to this Sync Manager can then be
switched on or off in the “PDO Assignment” box underneath. Restarting the EtherCAT system, or reloading
the configuration in configuration mode (F4), causes the EtherCAT communication to restart, and the
process data is transferred from the terminal.
EL72x1-0010
143
Version: 2.0
Summary of Contents for EL7201-0010
Page 2: ......
Page 47: ...Commissioning Fig 42 TCP IP setting for the Ethernet port EL72x1 0010 47 Version 2 0 ...
Page 57: ...Commissioning Fig 61 EtherCAT terminal in the TwinCAT tree EL72x1 0010 57 Version 2 0 ...
Page 119: ...Commissioning Fig 148 Touch Probe inputs EL72x1 0010 119 Version 2 0 ...
Page 138: ...Commissioning Fig 168 Process Data tab SM2 EL72x1 0010 default EL72x1 0010 138 Version 2 0 ...
Page 142: ...Commissioning Fig 171 Process Data tab SM2 EL72x1 0010 default EL72x1 0010 142 Version 2 0 ...