Notes on the programmer
programmer sequence
Time key
time (50 Hz)
in seconds
31,5 t1
Pre-ventilation time with open air gate
3
t2
Safety time
-
t2’ Safety time or fi rst safety time with burners using
pilot burners
6
t3
Short pre-ignition time (ignition transformer on ter-
minal 16)
-
t3’ Long pre-ignition time (ignition transformer on termi-
nal 15)
12
t4
Time between the t2' start and the consensus to the
valve on terminal 19 with t2
-
t4’ Time between the t2' start and the consensus to the
valve on terminal 19
12
t5
Time between t4 end and the consensus to the
power regulator or the valve on terminal 20
18
t6
Post-ventilation time (with M2)
3
t7
Time between consensus upon start-up and the
voltage to terminal 7 (start delay for fan motor M2)
72
t8
Start-up duration (without t11 and t12)
3
t9
Second safety time for burners using pilot burners
12
t10 Time from start-up to the beginning of the air pres-
sure control without air damper real travel time
t11 Damper opening travel time
t12 Damper travel time in low fl ame position (MIN)
18
t13 Allowed post-combustion time
6
t16 Starting delay of consensus to air damper OPEN-
ING
27
t20 Time up to automatic closure of the programmer
mechanism after burner start-up
NOTE: With voltage at 60 Hz the times are reduced by nearly
20%.
Summary of Contents for TBG 1100 MC
Page 2: ......
Page 26: ...24 28 0006160025_201305 ENGLISH WIRING DIAGRAM ...
Page 27: ...25 28 0006160025_201305 ENGLISH DISCONNECT THE JUMPER WITH VPS504 OPTIONAL ...
Page 28: ...26 28 0006160025_201305 ENGLISH GAS TRAIN OPTIONAL ITEM ...
Page 30: ...28 28 0006160025_201305 ENGLISH ...
Page 54: ...24 28 0006160025_201305 ESPAÑOL ESQUEMA ELÉCTRICO ...
Page 55: ...25 28 0006160025_201305 ESPAÑOL DESCONECTAR EL PUENTE CON VPS504 BAJO PEDIDO ...
Page 56: ...26 28 0006160025_201305 ESPAÑOL RAMPA DE GAS OPCIONAL ...
Page 58: ...28 28 0006160025_201305 ESPAÑOL ...
Page 82: ...24 28 0006160025_201305 PYCCKИИ ЭЛЕКТРИЧЕСКАЯ СХЕМА ...
Page 83: ...25 28 0006160025_201305 PYCCKИИ УБЕРИТЕ МОСТ СОЕДИНЕНИЯ С VPS504 ПО ТРЕБОВАНИЮ ...
Page 84: ...26 28 0006160025_201305 PYCCKИИ ГАЗОВАЯ РАМПА ОПЦИЯ ...
Page 86: ...28 28 0006160025_201305 PYCCKИИ ...
Page 110: ...24 28 0006160025_201305 TÜRKÇE ELEKTRİK ŞEMASI ...
Page 111: ...25 28 0006160025_201305 TÜRKÇE VPS504 İLE KÖPRÜNÜN BAĞLANTISINI KESİNİZ TALEP ÜZERİNE ...
Page 112: ...26 28 0006160025_201305 TÜRKÇE GAZ RAMPASI OPSİYONEL ...
Page 114: ...28 28 0006160025_201305 TÜRKÇE ...
Page 138: ...24 28 0006160025_201305 中 文 电气图 ...
Page 139: ...25 28 0006160025_201305 中 文 如果有需求 断开VPS504桥 ...
Page 140: ...26 28 0006160025_201305 中 文 可选 燃气管路 ...
Page 142: ...28 28 0006160025_201305 中 文 ...
Page 143: ......