76
•
0
•
1
•
2
•
3
configurationIndex
Index of the PRACH configuration.
For FDD: All PRACH configuration indexes
corresponding to Format 0 are supported. Refer to
Table 5.7.1-2 of 36.211.
For TDD: All PRACH configuration indexes with a
configured subframe configuration corresponding to
Format 0 and Format 4 are supported. Refer to Table
5.7.1-4 of 36.211.
Capacity Parameters:
Max Ue Num
The maximum number of concurrent users.
Range: 1 to 32
maxCsgMembers
The maximum number of CSG members.
Range: 1 to 32
resourceReservedForExistingUsers Reserved UE resource
Range: 0 to 100
5.5.2.4
Log Config
Refer to Figure 5-49 and Table 5-31 for a description of the
Log Config
parameters. For the
phyTrackSubsystemConfig
fields, click on the display icon
of a line to display the
configuration fields.
After entering the parameters, select
Save
to retain the configuration.
Figure 5-49: Log Config
Summary of Contents for Neutrino-224
Page 1: ...Neutrino 224 Indoor 2x125mW FDD TDD eNodeB Installation Guide December 2018 Version 1 7...
Page 20: ...20 Figure 4 7 FDD eNB GUI Home Page Figure 4 8 TDD eNB GUI Home Page...
Page 47: ...47 Figure 5 24 LTE Neigh Freq Settings 1 of 2 Figure 5 25 LTE Neigh Freq Settings 2 of 2...
Page 64: ...64 Figure 5 38 Cell ReSelection Parameter Figure 5 39 Additional Measurement Parameter...