8 — Testing
8–16
CX20/CX30/CX34 Service Manual
8.4
System Load Test (Menu Option)
Simulation of normal operations to check communication, totalisation and
performance of machines. There are two tests available, both of which
comprise the loading of transactions into the machine.
8.4.1
Loading the system
This test loads the system with a given number of transactions over a given
period of time and a report is printed. This is repeated until CLEAR is pressed.
This test can be used to check communication between machines.
What You Do
What You See
1
Select SYSTEM LOAD TEST option.
SYSTEM LOAD TEST
2
Press ENTER.
RECEIPT SIZE 0
3
Type in required receipt size. Receipt
size is the number of transactions that
appear on each printed report. Range
is from 1 to 99 transactions.
RECEIPT SIZE 10
4
Press ENTER.
PAUSE LENGTH 0
5
Type in required pause length. Pause
length is the time between each
transaction. Must be in the range 1 to
9 seconds. 0 takes you to the other
test (see Section 8.4.2).
PAUSE LENGTH 2
Summary of Contents for CX20 SERIES
Page 258: ...PL 1 CX20 CX30 CX34 Service Manual Section PL Parts List ...
Page 284: ......
Page 287: ......
Page 317: ...Addendum A Phase 1 4 and CX34 Parts List A 30 CX20 CX30 CX34 Addendum A ...
Page 318: ......
Page 321: ......
Page 323: ...Contents B 2 Addendum B ...
Page 343: ...Addendum B Phase 1 5 1 5 3 and New Main PCB B 22 Addendum B ...
Page 344: ......
Page 347: ......
Page 351: ...PL Parts List Devlin Keyboard C 6 Addendum C ...
Page 352: ......